3.1 Start-up and Test
3. OPERATION
34
Input AC LINE
BREAKER
AC OUTPUT
FUSE
Once utility and cable connections have been made, the APC or APL should be
tested before placing it into service.
Procedure: Photos; APC-3.1.a; APL-3.1.b
1. Before applying power, ensure that the
AC LINE circuit breaker is in the OUT (OFF) position (the white portion of
the stem will be visible). If it is not, depress the breaker button all the way
until it resets.
2. Plug the APC’s power plug into the receptacle provided in the internal AC
receptacle box. APL models are hard-wired into the terminal block.
3. If the APC is equipped with a LA-M (or LA-P) plug-in MOV, plug it into the
designated receptacle.
4. Switch the external service entrance breaker (located outside of the
enclosure) to ON.
5. Activate the APC’s (APL’s) internal AC circuit breaker by pressing the button
all the way in (the white portion on the stem will not be visible).
6. Use a true reading RMS digital multimeter to measure the output voltage at
the output connector of the APC (APL). The voltage should read between
57 and 63 VAC for 60VAC output models (45.6 to 50.4 for 48V models).
NOTE: If a non-RMS type voltmeter is used, the reading can be off by as much
as 10% due to the “quasi” square wave output of the ferroresonant transformer.
7. If the AMM-C ammeter option is installed (APC models only), ensure that
the current draw is in the correct range, (i.e., below 8 amps for 8 amp units,
and below 14 amps for 14 amp units).
8. Place the cover on the APC (APL). Make sure that the tabs on the cover
align with the baseplate assembly. Secure the hold-down screw and
lock the enclosure.
Photo 3.1.a
APC Circuit Breaker and Fuse
Location
Photo 3.1.b
APL Circuit Breaker and
Fuse Location
Vista de página 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Comentários a estes Manuais

Sem comentários