Vista de página 0
CFR
3000 and 3000RM
Uninterruptible Power Supplies
From Alpha Technologies
!!
!!
! Operators Manual
Vista de página 0
1 2 3 4 5 6 ... 85 86

Resumo do Conteúdo

Página 1 - 3000 and 3000RM

CFR3000 and 3000RMUninterruptible Power SuppliesFrom Alpha Technologies!!!!! Operator’s Manual

Página 2 - Operator’s Manual

1 Introduction41.2 Unpacking and Inspection Checklist (Continued)Complete the following for your recordsSerial # __________________________________Opt

Página 3 - Save This Manual

5 1 Introduction1.3 The Alpha CFR 3000 and 3000RM1.3.1 Front PanelTIP: Unless otherwise shown in this manual, the 3000 and 3000RM are identical andope

Página 4 - Safety Checklists

1 Introduction61.3 The Alpha CFR 3000 and 3000RM (Continued)3000 Rack Mount (RM)ALARM OFFMANUALSTARTOUTPUT LO ADOVERLOAD100%75%50%25%LINE PRESENTLINE

Página 5 - Safety Checklists (Continued)

7 1 Introduction1.3 The Alpha CFR 3000 and 3000RM (Continued)1.3.2 Rear PanelFigure 1.1Rear Panels3000RM3000Fan (3000 Only)This fan cools the unit. It

Página 6 - Table of Contents

1 Introduction81.3 The Alpha CFR 3000 and 3000RM (Continued)Input Circuit BreakerThis provides protection for the unit. It canbe used as an input powe

Página 7 - Section 1

9 1 Introduction1.3 The Alpha CFR 3000 and 3000RM (Continued)RS-232 ConnectorThis DB–9 port is the RS–232 connection(Section 2.6).LAN Interface Connec

Página 8 - 1.1 The CFR Advantage

10Section 2InstallationThis section shows you how to installand connect the Alpha CFR 3000 and3000RM UPS’s:• A pre-installation checklist (Section 2.

Página 9 - Read This Manual

11 2 Installation2.1 Pre–Installation Checklist2.1.1 Site PreparationInstall the unit upright in a dry, well-ventilated, dust free environment. There

Página 10 - This CFR was purchased from

2 Installation 12The unit should be wired to dedicated circuit equipped with a properly sized circuit breaker.The breaker’s size is the unit’s maximum

Página 11

13 2 Installation2.2 Installing the Unit2.2.1: CFR 3000TIP: The seismic brackets can be removed if they are not required by the local code oryou are n

Página 12 - 1 Introduction

!!!!!Operator’s Manual!!!!!CFR 3000 and 3000RMUninterruptible Power SuppliesALARM OFFMANUALSTARTOUTPUT LOADOVER L OAD100%75%50%25%LINE PRESENTLINE FA

Página 13

2 Installation 142.2 Installing the Unit (Continued)5 If the brackets are not needed, remove the cover and the front panel as described in Sec-tion 5.

Página 14

15 2 Installation2.3 Connecting the Unit2.3.1: Plug and ConnectorDanger: All wiring must meet the local electrical code. Mark all circuit breakers sup

Página 15

2 Installation 162.3.2: Terminal BlockDanger: All wiring must meet the local electrical code. Mark all circuit breakers supply-ing power to the unit.

Página 16 - Section 2

17 2 Installation2.3 Connecting the Unit (Continued)ycneuqerFycneuqerFycneuqerFycneuqerFycneuqerF *egatloV*egatloV*egatloV*egatloV*egatloVzH06zH06zH06

Página 17 - 2.1.1 Site Preparation

2 Installation 182.4 Connecting the External Battery PackDANGER: There are hazardous voltages inside the battery packs. Use extreme cau-tion. For mor

Página 18 - 2.1.3 Standby Generator

19 2 Installation2.4 Connecting the External Battery Pack (Continued)Figure 2.6Connecting an External Battery Pack to the 3000245Figure 2.5Connecting

Página 19 - 2.2 Installing the Unit

2 Installation 202.5 Connecting the External Alarm PortAn external alarm panel can be connected to the external alarm port (Figure 2.7). The port’scon

Página 20

21 2 Installation2.6 Connecting the RS–232 PortThe unit can be remotely setup, monitored, and tested by connecting the unit’s DB–9 connectorto a compu

Página 21 - 2.3 Connecting the Unit

2 Installation 222.7 Connecting the LAN PortThe unit can be remotely monitored and shutdown with the unit’s DB–9 LAN port (Figure 2.9).Two dry contact

Página 22

23 2 Installation2.8 Transformer Output Load Sharing2.8.1: Transformer OutputThe units have a single phase output. They do NOT have three phase charac

Página 23 - *egatloV*egatloV

CFR 3000 and 3000RMNOTICE:The CFR 3000 and 3000RM generates, uses and can radiate radio frequencies if not installed andtested in accordance with the

Página 24

2 Installation 242.8 Transformer Output Load Sharing (Continued)2.8.2.1: Measuring the Output CurrentThis uses a clip-on current probe (Figure 2.12 fo

Página 25 - Figure 2.5

25 2 Installation2.8 Transformer Output Load Sharing (Continued)2.8.2.2: Displaying the Output CurrentTIP: When using the display panels, you must cal

Página 26 - 87654321

26Section 3OperationThis section shows you how to operatethe Alpha CFR 3000 and 3000RM UPS’s:• How to turn the unit on and off (Sections 3.1, 3.2).• H

Página 27 - TXDRXDGND

27 3 Operation3.1 Turning On the UnitWARNINGS:1) The unit runs warm to the touch. During the first few weeks of operation, a brand newunit may give of

Página 28 - 2.7 Connecting the LAN Port

3 Operation28Cold Start ProcedureThis starts the unit with battery power when line power is unavailable or unqualified. Backupbattery power is provide

Página 29 - 2.8.2: Load Sharing

29 3 Operation3.2 Turning Off the UnitThe emergency shutdown procedure is on the inside rear cover.Procedure:1 One at time, turn off the loads.2 Switc

Página 30

3 Operation303.3 Testing the UnitThe self test confirms the unit can switch from line to backup battery power and back withoutinterrupting power to th

Página 31 - Terminal Block

31 3 Operation3.4 Troubleshooting With the SIDThe SID’s Output Load LEDs have two functions:• When the unit is operating normally, it serves to show t

Página 32 - Section 3

3 Operation323.5 Controlling the Unit with the Standard Interface Device (SID)The Standard Interface Device (SID) display panel (Figure 3.4) shows vit

Página 33 - 3.1 Turning On the Unit

33 3 OperationLow Battery ShutdownThis red LED turns on when the battery voltage is 12% below nominal. The unit automati-cally shuts itself down and n

Página 34 - Cold Start Finished

CFR 3000 and 3000RMSafety ChecklistsDANGER: Sealed lead-acid batteries with high energy and chemical hazards areused. This manual contains important o

Página 35 - 3.2 Turning Off the Unit

3 Operation343.5 Controlling the Unit with the Standard Interface Device (SID) (Continued)Output LoadThese five green LED's show the unit’s loadi

Página 36 - 3.3 Testing the Unit

35Section 4CommunicationThis section shows you how to controlthe Alpha CFR 3000 and 3000RM UPS’swith RS–232 commands:• How to set up communications wi

Página 37 - Procedure:

4 Communication364.1 RS–232 Set-UpWire the DB–9 connector as shown in Section 2.6, “Connecting the RS–232 Port.”Windows HyperTerminal Connection For

Página 38 - Low Battery Warning

37 4 Communication4.1 RS–232 Set-Up (Continued)4The Com 1 Properties screen appears(Figure 4.3). Fill out the fields as shown.5Click OK.Figure 4.3COM

Página 39

4 Communication384.2 Using the Opening MenuThe opening menu (Figure 4.5, also see Figure 4.4) is the top-level menu. It shows the line’sstatus, displa

Página 40 - Output Load

39 4 Communication4.2 Using the Opening Menu (Continued)Figures 4.6 to 4.9 list the alarms, how they appear on the screen and what they mean.Figure 4.

Página 41 - Section 4

4 Communication404.2 Using the Opening Menu (Continued)Figure 4.9Environmental and Service AlarmssmralAecivreSdnalatnemnorivnEsmralAecivreSdnalatnemno

Página 42 - 4.1 RS–232 Set-Up

41 4 Communication4.3 Menu Tree• To reach any main or sub menu from the opening menu, type its number and press Enter.• Detailed descriptions of each

Página 43

4 Communication424.4 System, Input, Output & Battery ParametersMain menus #1 to #4 are read only menus which display important operating paramete

Página 44 - 4.2 Using the Opening Menu

43 4 Communication4.4 System, Input, Output & Battery Parameters (Continued)4.4.3 Main Menu #3: Output ParametersThis displays selected output pa

Página 45

CFR 3000 and 3000RMiiiSafety Checklists (Continued)Live battery wires must not touch the unit’s chassis or any other metal objects. This cancause a fi

Página 46

4 Communication444.4 System, Input, Output & Battery Parameters (Continued)Output Terminal BlockLNOutput Voltage 1230 VAC ReceptacleOutput Curren

Página 47 - 4.3 Menu Tree

45 4 Communication4.5 User ParametersMain menu #5, user parameters, lets you set up the automatic self test, remotely shut down theunit, change the p

Página 48

4 Communication464.5 User Parameters (Continued))deunitnoC(sretemaraPresU)deunitnoC(sretemaraPresU)deunitnoC(sretemaraPresU)deunitnoC(sretemaraPresU)

Página 49

47 4 Communication4.5 User Parameters (Continued))deunitnoC(sretemaraPnwodtuhStuptuOteS)deunitnoC(sretemaraPnwodtuhStuptuOteS)deunitnoC(sretemaraPnwo

Página 50 - Output Voltage 1

4 Communication484.5 User Parameters (Continued)4.5.3 Sub Menu #56: Transmit Unsolicited AlarmsThese menus allow you to prevent or delay the continuo

Página 51 - 4.5 User Parameters

49 4 Communication4.6 Maintenance ParametersMain menu #7, maintenance parameters, allows you to adjust the unit’s detection and warningparameters to

Página 52 - )deunitnoC(sretemaraPresU

4 Communication504.7 Installing and Using the External ModemUses of the External ModemWhere a network is not available, you can connect an external m

Página 53 - Figure 4.16

51 4 CommunicationStep 1: Enable the CFR’s Modem FeatureThe CFR is shipped with the modem feature disabled. To enable it:1 Connect a computer to the C

Página 54

4 Communication524.7 Installing and Using the External Modem (Continued)Step 2: Connect and Configure the ModemUse a shielded, null-modem serial cabl

Página 55 - 4.6 Maintenance Parameters

53 4 Communication3 The initialization string (Item #527) is a set of commands the CFR sends to themodem to initialize it. For a US Robotics modem, th

Página 56 - Settings:

CFR 3000 and 3000RMivTable of ContentsThe emergency shutdown procedure is on the inside rear cover1. Introduction ...

Página 57

4 Communication54Step 3: Initalize the ModemTo initalize the modem start a CFR self test (Section 3.3).The CFR must initialize the modem. If a remote

Página 58

55 4 Communication4.7 Installing and Using the External Modem (Continued)How the CFR Sends AlarmsTo send an alarm, the CFR sends the dial command to

Página 59

4 Communication564.7 Installing and Using the External Modem (Continued)Figure 4.22External Modem Setup Menu ItemssuneMputeSmedoMlanretxEsuneMputeSme

Página 60 - Modem Installation Finished

57 4 Communication4.7 Installing and Using the External Modem (Continued))deunitnoC(suneMputeSuneMmedoMlanretxE)deunitnoC(suneMputeSuneMmedoMlanretxE

Página 61 - How the CFR Sends Alarms

58Section 5MaintenanceThis section describes how to maintainthe Alpha CFR 3000 and 3000RM UPS’s:• How to measure the battery back up time (Sec-tion 5.

Página 62 - Figure 4.22

59 5 Maintenance5.1 Testing the Battery Backup TimeThis test measures how long the batteries can provide backup power by having them power theloads un

Página 63 - 57 4 Communication

5 Maintenance 605.2 TroubleshootingMost problems involve:• Are the Input, Battery and Output circuit breakers switched on?• Is the input voltage corre

Página 64 - Section 5

61 5 Maintenance5.2 Troubleshooting (Continued)Figure 5.1Troubleshooting Table (Continued)motpmySmotpmySmotpmySmotpmySmotpmyS esuaCesuaCesuaCesuaCesua

Página 65

5 Maintenance 625.3 Returning the CFR to Alpha for RepairsBefore returning a unit for repair, obtain a Return Material Authorization (RMA) number from

Página 66 - 5.2 Troubleshooting

63 5 Maintenance5.4 Replacing the Internal Batteries (Continued)Tools and Materials Required:• Phillips Screwdriver.•7/16 and 3/8 inch wrenches for th

Página 67 - Figure 5.1

1Section 1IntroductionThis section introduces you to the AlphaCFR 3000 and 3000RM UPS’s:• The CFR advantage (Section 1.1).• An unpacking and inspectio

Página 68

5 Maintenance 645.4 Replacing the Internal Batteries (Continued)Step 2: Charger Voltage TestThis tests the unit’s charger so the new batteries will no

Página 69

65 5 Maintenance5.4 Replacing the Internal Batteries (Continued)Step 3: Battery ReplacementProcedure:1 Disconnect the negative (black) battery leadfro

Página 70 - 54 VDC to 57 VDC

5 Maintenance 665.4 Replacing the Internal Batteries (Continued)7 Put the battery foam blocks on top of the batteries.8 Attach the positive (red) batt

Página 71

67 5 Maintenance5.5 Configuring the Input/Output VoltageThe unit is factory configured to your input/output voltage specifications.• Units configured

Página 72 - Front of Unit

5 Maintenance 685.5 Configuring the Input/Output Voltage (Continued)3 For the CFR 3000RM, remove the front panel by unscrewing the 6 screws and liftin

Página 73 - Tools and Materials Required:

69 5 Maintenance5.5 Configuring the Input/Output Voltage (Continued)Figure 5.6High Voltage Board123456789101112 TB1W4S1JP1-JP6W3W5W2W1Figure 5.7High V

Página 74

5 Maintenance 705.6 Battery Run TimesThe times in these charts are to be used in conjunction with the battery run time you measured inSection 5.1, “Me

Página 75

71 5 Maintenance5.6 Battery Run Times (Continued)skcaPyrettaBMRA84PBEhtiw)MR0003RFC(sledoMtnuoMkcaRskcaPyrettaBMRA84PBEhtiw)MR0003RFC(sledoMtnuoMkcaRs

Página 76 - 5.6 Battery Run Times

5 Maintenance 725.7 SpecificationssnoitacificepSlacinahceMsnoitacificepSlacinahceMsnoitacificepSlacinahceMsnoitacificepSlacinahceMsnoitacificepSlacina

Página 77

73Index120 VAC OutputConnecting Loads To ...23–253000Battery Charger Test ...

Página 78 - 5.7 Specifications

1 Introduction21.1 The CFR Advantage! Advanced Power Protection TechnologyAlpha’s CFR Uninterruptible Power Supply (UPS) provides continuous and condi

Página 79

74IndexFront Panel ...6RS–232 Connector... 9, 21Site S

Página 80

75IndexIIIDExternal Connector ... 9Location of... 5,

Página 81

76IndexPPack, External Battery, Installation...18–19Panel, Operate Unit With SID...32–34Panel, Front, Removing

Página 82

77IndexTransformer Output, Overloading ... 23Troubleshooting ...31, 60–61Tower Mounting

Página 83

Warranty78Alpha Technologies warrants its equipment to be free of manufacturing defects in material and workmanshipfor a period of 24 months from the

Página 84 - LIMITED 24-MONTH WARRANTY

To order parts or for technical information, contact Alpha Technologies customer service de-partment directly at::setatSdetinU:setatSdetinU:setatSdet

Página 85 - Emergency Shutdown Procedure

Alpha sales and service offices located throughout the world© 2003 Alpha Technologies http://www.alpha.comPrinted In Canada 017–108–B0 06 / 0

Página 86

3 1 Introduction1.2 Unpacking and Inspection ChecklistTIP: If items are missing or damaged, contact Alpha and the shipping company atonce. Most shippe